
| ITEM | DESCRIPTION |
|---|---|
| Name of Project | Feasibility Study, Environmental and Social Impact Study, Preliminary and Detailed Engineering Design of Kehancha – Lolgorian – Mulot (B1) Road and Associated Spur Roads (253km) |
| Name of Client | Kenya National Highways Authority (KeNHA) |
| Financier | Government of the Republic of Kenya (GoK) |
| Objectives of the Project | To design the road to its current class B road with improved road geometry & enhanced cross section, provision of adequate drainage structures, dualling within town sections to enhance the capacity, provisions of bypass roads for towns and interchanges at major intersections with aim to reduce travel time and associated vehicle operating cost (VOC), promoting trade, alleviating poverty and promoting social-economic development of the areas served by the road. |
| Description of the Services | Feasibility study, environmental and social impact assessment, preliminary and detailed engineering design of the Kehancha–Lolgorrian–Mulot (B1) Road and associated spur roads. The assignment involves reviewing existing data and undertaking economic feasibility assessments, social, environmental and physical investigations, traffic modelling, materials investigations, engineering surveys, alignment development and preliminary road design. Detailed engineering surveys and design, pavement and materials investigations, engineering cost estimates, implementation planning and preparation of tender documentation for the selected road alignment and associated town and market roads. |
